Find HDPE Geocell, Anti-Erosion Geocell, Erosion Control Geocell on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > HDPE Geocell > China Factory Produce High Quality Plastic HDPE Geocells Geoweb

China Factory Produce High Quality Plastic HDPE Geocells Geoweb

Payment Type: L/C, T/T, Western Union, Paypal
Min. Order: 5000

Basic Info

Model No.:  GEOC-80

Product Description

Model NO.: GEOC-80 Application: Retaining Wall, Railway, Highway, Road Feature: Corrosion Resistant, Chemical Stability Trademark: GP Specification: TGGS75-400, TGGS50-400 HS Code: 39259000 Filler: Plastic Function: Distributing Load, Anti-deforming Material: HDPE Transport Package: Belt Origin: Hebei China 3D Geocell
Geocell is made of HDPE reinforced sheet material, A three-dimensional mesh cell chamber formed by welding of high strength.Generally by the ultrasonic pin type welded together.Due to the need of engineering, some holes on the diaphragm.
   
Geocell technical data
 
Type  Cell Depth mm weld spacing
mm
Seam Peel strength
N ≥

TGGS200-330

200

330

2000

TGGS150-330

150

330

1500

TGGS100-330

 100

330

1000

TGGS75-330

75

330

750
TGGS50-330 50 330 500
TGGS200-400 200 400  2000
TGGS150-400 150 400 1500
TGGS100-400 100 400 1000
TGGS75-400 75 400 750
TGGS50-400 50 400 500
Application:
1.  Used for the stability of railway roadbed
2.  To stabilize the desert highway roadbed
3.  Used in the governace of shallow water channel
4.  Used for the foundation feinforcement of retaining wall.wharf,. levee 5. For the management of desert,beaches and river banks.

Application of HDPE plastic geocell used in roadbed  reinforcement
 1. processing  half  fill Semi roadbed 
 build up the embankment on the ground on the slopes of the natural slope ACTS in 1:5, supporting subsoil should dig the steps, The step width shall be less than 1 m, when building or rebuilding roads widened by installments, Convergence between the new and old roadbed fill slope ,should dig the step, high grade highway width is 2 m,  laid large geocell in each of the steps horizontally, using the large geocell  of their own facade confining reinforcement effect, better solve the problem of uneven settlement

2. subgrade in wind drift sand region
Sand subgrade should be given priority to with low embankment, region filling height not less than 0.3 m. generally due to its low subgrade, sand subgrade construction in professional requirements and heavy load, adopting large chamber loose packing confining effect, can be in limited the height of the roadbed with high stiffness and strength, to inherit the load stress of large vehicles.
3. Reinforced back subgrade soil
Using large geocell  can better achieve the goal of  abutment back reinforced ,  can generate enough friction between the geocell and packing .  and effectively reduce roadbed uneven subsidence, finally can effectively relieve the abutment jump car "disease early impact damage of bridge deck.
4. subgrade in permafrost region
In permafrost regions fill roadbed construction, should reach a minimum filling height in order to prevent or cause a frozen layer ceiling Frothing decreased, resulting in an excess of embankment settlement occurs. Geocell unique overall unconfined facades reinforced effect and effectively implemented, can ensure a minimum filling height in some special area to the maximum extent, and to fill a high-quality strength and stiffness.
5. The collapsibility loess roadbed treatment
When the highway and the highway collapse loess and loess lot better compression by wet, or foundation bearing capacity is lower than the high embankment to allow third-party vehicle load and weight of pressure embankment, subgrade bearing capacity requirements should also for processing, then the superiority of Geocell on manifest is no doubt.

Our service

· The sample is free.
· The quality of our products are qualified.
· Our delivery speed will be the fastest.
· We can provide the most professinal technical guidance and service

FAQ
1. How about the delivery time?
    Lead time since receipt of 30% T/T deposit payment: 3 weeks. 
2. What's are the MOQ?
    We can according to your condition to set the MOQ.
    And we can provide you samples for quality inspection.
 
3. How to deal with the sample charge?
    Accordeing to our company policy, the samples are free, we only charge the freight fee.And we will return the freight fee If you set the order.
 
4. Can you produce the product according to customers' requirements?
    Sure, we are professional manufacturer, OEM and ODM are both welcome.
 

Contact us if you need more details on China Factory Produce High Quality Plastic HDPE Geocells Geoweb. We are ready to answer your questions on packaging, logistics, certification or any other aspects about China HDPE Geocell、China HDPE Plastic Geocell. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : HDPE Geocell